Complete Plumbing Checklist for New Home Construction

Most plumbing problems that show up years after a house is built trace back to a decision made before the walls were ever closed. This checklist walks through what needs to be decided and confirmed at each stage of construction, from the first site assessment through to final commissioning, so nothing gets locked behind plaster before it’s been checked.

Why This Checklist Is Organised by Construction Stage

A plumbing checklist that just lists “things to think about” isn’t especially useful, because the right time to decide on pipe material is not the same as the right time to confirm fixture positions. This guide is organised by construction stage instead, so you can use the relevant section at the point you actually need it, rather than trying to plan everything at once before ground has even been broken.
This matters because plumbing decisions have very different costs of reversal depending on when they’re made. A pipe material choice made before construction begins costs nothing to change. The same decision discovered to be wrong after walls are plastered can mean opening finished surfaces to correct it. Working through this checklist stage by stage, rather than treating plumbing as one undifferentiated task, is what keeps most decisions in the cheap-to-change category.

An African American plumber and homeowner reviewing a detailed construction plumbing plan pinned to a site office wall.
On-Site Collaboration: Reviewing critical plumbing blueprints with your contractor before permanent installations are locked in

Stage 1: Before Construction Begins

Decisions at this stage are the cheapest to change and the most consequential if skipped.

  1. Water source confirmed: mains, borehole, or both
  2. Water storage requirement estimated (tank size, if any)
  3. Total bathroom count and general fixture layout agreed with your architect
  4. Pipe material preference discussed with your contractor
  5. Drainage connection point identified: municipal sewer or septic system
  6. A licensed plumbing contractor engaged before drawings are finalised, not after.

Pipe material specifically is worth a real conversation at this stage rather than a default choice. Most new residential water supply in Kenya now uses PP-R piping over older galvanized iron (GI) systems, largely because it doesn’t corrode over time, though the right choice can depend on specific site conditions your contractor should walk you through rather than assume.

Stage 2: Rough-In, Before Walls Close

This is the highest-stakes stage. Once walls are plastered and floors are screeded, changes here become demolition, not adjustment.

  1. Pipe routing confirmed against final architectural drawings, not verbal descriptions
  2. Drainage fall (slope) measured and confirmed for every drainage run
  3. Inspection chamber positions agreed and marked
  4. Fixture rough-in positions confirmed and physically marked before tiling or plastering begins
  5. Any utility room, laundry, or secondary kitchen sink plumbing included, not left for later
  6. Solar or electric water heating connection points planned if part of this project

Stage 3: Pressure Testing and Inspection

Before any pipework is covered, permanently, it needs to be tested, not just installed.

  1. Water supply system pressure tested before walls close
  2. Drainage system checked for correct fall and free flow
  3. Any leaks identified and resolved before covering pipework
  4. Photos or records kept of pipe routing for future reference, since it won’t be visible again
A close-up of a Kenyan plumber’s hands holding a pressure test gauge connected to green PP-R water supply piping inside a construction site.
Ensuring Leak-Free Systems: A Kenyan plumber conducts a vital pressure test on new water supply lines before the walls are closed.

Stage 4: Fixture Installation


With pipework tested and covered, this stage is about connecting fixtures correctly and confirming everything performs as intended.

  1. Toilets, basins, showers, and kitchen fixtures connected and checked for leaks at each connection
  2. Water pressure confirmed at every fixture, not just at the main supply point
  3. Drainage confirmed to flow freely from every fixture
  4. Solar or electric water heater connected and tested, if part of this project

It’s worth checking pressure at fixtures individually rather than assuming that because the main supply tested well, every downstream fixture will perform the same way. Distance from the supply point, the number of fixtures drawing simultaneously, and elevation within a multi-storey home can all mean a fixture at the far end of the system delivers noticeably weaker pressure than one close to the source, worth identifying now rather than after move-in.

Stage 5: Final Commissioning

The last stage confirms the whole system works together, not just each fixture individually.

  1. Full system run simultaneously (multiple fixtures at once) to confirm pressure holds under real usage
  2. Water storage system, if included, tested through a full fill and draw-down cycle
  3. Any warranty documentation and system diagrams handed over and kept for future reference
  4. A final walkthrough completed with your contractor before final payment.

The simultaneous-use test is easy to skip because everything has already passed its individual checks, but it’s the closest thing to a real-world usage test the system will get before you move in. A shower running while the kitchen tap is on and a toilet is flushed is a normal Monday morning in most households, and it’s worth confirming the system handles that combined load before the contractor leaves site, not after you discover it can’t.

Common Mistakes Across These Stages


Skipping Stage 1 and going straight to rough-in. Decisions made without a clear water source and fixture layout tend to get revisited expensively once walls are already up.
Treating pressure testing as optional. It adds time before walls close and saves considerably more time and cost than it costs, skipping it is a false economy.
Not keeping records of pipe routing. Once pipework is covered, a photo or diagram is the only way anyone, including a future plumber, will know exactly where it runs.
Making fixture position changes after tiling has started. This is one of the most common and most expensive change requests contractors receive, and it’s entirely avoidable with Stage 2 confirmation done properly.
Assuming the contractor will flag issues without being asked. A good contractor will raise concerns, but it’s still worth actively asking at each stage whether anything about your specific site or design has changed the original plan, rather than assuming silence means everything is on track.

Aflex Professional Insight

The projects that move through construction with the fewest plumbing-related delays are consistently the ones where the homeowner or contractor treated Stage 2 rough-in confirmation as a hard checkpoint, not a formality to move past quickly. A short pause to confirm routing against drawings before walls close costs almost nothing compared to what it prevents.
Editorial note: same caveat as prior articles, this is a professional generalisation, not sourced first-hand data from a specific Aflex project.

Frequently Asked Questions

At what stage should I hire a plumbing contractor?

Before your architectural drawings are finalised, ideally. Early involvement means pipe routing and fixture layout are planned correctly from the start rather than adjusted afterward.

Yes, but it means breaking into finished work, which is considerably more expensive and disruptive than making the same change before walls close.


Yes. A system can appear to work initially and still have a slow leak or weak point that only becomes apparent under sustained pressure, testing catches this before it’s hidden behind walls.

It’s not strictly necessary, but confirming fixture positions in person before tiling begins reduces the chance of a mismatch between what was planned and what gets built.

It varies by house size and system complexity, but rough-in and testing are usually scheduled in coordination with the broader construction timeline rather than as an isolated phase.

What to Do Next

If you’re still finalising your architectural drawings, it’s worth reviewing your full scope with a contractor before that stage locks in, our services overview covers water supply, drainage, and solar water heating together, since new-build projects often plan all three at once. For drainage-specific planning, see drainage installation. When you’re ready to bring in a contractor, our team covers projects across Kiambu, Nairobi and our other service areas, and you can read more about how we approach new-build plumbing projects before getting in touch.